VW Load Cell VWLC-5050


 
The VWLC 5050 series of Vibrating Wire Load Cells consist of a solid cylinder of high strength steel with 3 vibrating wire strain sensors mounted parallel to the longitudinal axis arranged equidistant around the circumference which measure the compression of the cylinder under load.

Enquiry

Descriptions

With the multi sensor configuration it is possible to obtain accurate readings under mildly eccentric loading conditions as the sensors are read individually.
 
The readings from the individual sensors are averaged and when used in conjunction with a calibration factor, supplied with each cell, allow the applied load to be calculated.
 
The VWLC 5050 series is typically used to measure and monitor compressive load or force in structural members, struts and piles.
 
Connection to the load cell is via a heavy-duty multi-core sheathed cable which can be connected to a direct portable readout, data logging or Wi-SOS 400 system.

Technical Specifications

Thermistor 3k Ohms at 25°C
Over range capacity 150% FS
Accuracy (system accuracy depends on loading conditions) 0.5% FS (0.25% FS available on request)
Resolution 0.05% FS
Output 1200 – 2800 Hz
Temperature range -20°C to + 80°C
Material High tensile, stress relieved steel
Capacity 250, 500, 750, 1000, 1250, 1500, 1750, 2000, 2500, 3000, 4000, 5000kN
Diameter 45, 63, 76, 88, 98, 108, 116, 124, 138, 151, 174, 195mm
Height 100mm

Case Studies

Gardemobanen Venjar – Eidsvoll Rail Track

In 2018, NCC won a contract with Bane NOR to build a stretch of double track on the rail line from Venjar to north of Eidsvoll station in Akershus, Norway. The new double track is due to be operational by autumn 2022 and the contract work fully completed by summer 2023.
 
Around four kilometers of new double track will also be built north of Eidsvoll. In addition, there will be a 380m soft-ground tunnel, several rail bridges and culverts and rail engineering upgrades at Eidsvoll station. In total, over a million cubic meters of earth will have to be excavated from the site.
 
The project involved the following challenges:

  •  Extensive soft ground & clay deposits.
  •  Existing track operated as normal a few meters from the construction area.
  •  Important historic buildings (Eidsvoll church and rectory) close to the site.
  •  Important environmental and nature (wildlife and agricultural) area close by.

Gardemobanen Venjar – Eidsvoll Rail Track Case Study

Downloads

VW Load Cell VWLC-5050 Datasheet

Engineering, Consultancy, and Solutions Provider
Malaysia
Vietnam
FOLLOW US
Malaysia
Vietnam
Engineering, Consultancy, and Solutions Provider

Copyright © – 2023 mitssolutions.asia
Website Design Malaysia